Composite footings, foundation panels, and above grade panels.
LINEAR FEET
96 Ft
TIME TO INSTALL
1 Hour
Project Gallery
Part 2: Moving the Entire Foundation off of the Setbacks
The foundation was installed within the setbacks so we had to move the entire foundation 6′ over. This mistake turned out to be a super easy fix as we picked up the entire foundation and moved it over. If this were concrete, it would have been a disaster. With our system, we just excavated the appropriate area, and then picked up the foundation and moved it over with the excavator. The first time in history this has been done!
Part 3: Installing the Panels Above Grade